User Tools

Site Tools


slot_usage_reports

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
slot_usage_reports [2016/12/16 16:29]
mgstauff
slot_usage_reports [2017/01/10 21:23] (current)
mgstauff
Line 7: Line 7:
 Quick notes on slots and Project Slot Quotas: Quick notes on slots and Project Slot Quotas:
  
 +  * A "slot" is a cpu core and 6GB of RAM (3GB on the basic nodes).
 +  
 +  * Each Group/Lab/Billing-Entity has a "Basic Project Slot Quota" as a part of the required Basic Account. See the link above for details. This report is meant for deciding how many slots to choose for the optional "High-speed" Project Slot Quotas.
  
-Note that a user can be in any number of different Project Slot Quotas, and can be in Project Slot Quotas that belong to different Group/Lab/Billing-Entities. +  user can be in any number of different Project Slot Quotas, and can be in Project Slot Quotas that belong to different Group/Lab/Billing-Entities. 
  
-Note that users can have different per-user slots quotas within a Project Slot Quota.+  Users can have different per-user slots quotas within a Project Slot Quota.
  
-Note that slots are added to Project Slot Quotas in increments of 16, so there is a 16-slot minimum for a High-speed Project Slot Quota.+  Slots are added to Project Slot Quotas in increments of 16, so there is a 16-slot minimum for a High-speed Project Slot Quota.
  
 __NOTE__ Project Slot Quotas will be put into use very soon. Once this is done, each job will be assigned to an SGE project (with the same name as a Project Slot Quota) to track and limit resources by Project Slot Quota. For users who work with multiple groups or labs, this means their quotas will then be set based on the project they assign to their jobs, allowing them to work flexibly with multiple labs. However, the report below is from jobs that do not include that information, so users who work within multiple groups have their usage below reported only as a part of their 'home' group/lab. __NOTE__ Project Slot Quotas will be put into use very soon. Once this is done, each job will be assigned to an SGE project (with the same name as a Project Slot Quota) to track and limit resources by Project Slot Quota. For users who work with multiple groups or labs, this means their quotas will then be set based on the project they assign to their jobs, allowing them to work flexibly with multiple labs. However, the report below is from jobs that do not include that information, so users who work within multiple groups have their usage below reported only as a part of their 'home' group/lab.
Line 33: Line 36:
 | 2 | 20GB | 3.33  (20GB / 6GB) | | 2 | 20GB | 3.33  (20GB / 6GB) |
    
-**Slot Equivalent Time**+**Slot Equivalent Time (SET)**
  
 The "Slot Equivalent Time" (SET) is the period of time a job runs, multiplied by the SE of the job, reported in units of days or 'divisions'. The "Slot Equivalent Time" (SET) is the period of time a job runs, multiplied by the SE of the job, reported in units of days or 'divisions'.
slot_usage_reports.1481905781.txt.gz · Last modified: 2016/12/16 16:29 by mgstauff